IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
SIC 3569 General Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0207 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,410 $0 Implemented
UF0207 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,914 $1,700 Implemented
UF0207 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,587 $0 Implemented
UF0207 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,662 $0 Implemented
UF0207 # 10 Y:1998 10 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,783 $5,000 Implemented
KU0491 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,610 $1,000 Implemented
KU0491 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $2,630 Implemented
KU0491 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $780 Implemented
KU0491 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $210 Implemented
KU0491 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $0 Implemented
KU0491 # 11 Y:1998 11 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $34,550 $60,000 Implemented
UD0545 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,984 $10,116 Implemented
SD0194 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,625 $5,210 Implemented
SD0194 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,430 $450 Implemented
SD0194 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $706 $1,150 Implemented
SD0194 # 05 Y:1998 05 1998 USE OPTIMUM THICKNESS INSULATION $2,213 $1,559 Implemented
SD0194 # 07 Y:1998 07 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $2,400 $1,000 Implemented
UF0194 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $154 Implemented
UF0194 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,517 $139 Implemented
UF0194 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $660 $1,896 Implemented
UF0194 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $144 $400 Implemented
UF0194 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $850 Implemented
UF0194 # 11 Y:1998 11 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,635 $3,215 Implemented
UD0534 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,347 $29,176 Implemented
UD0534 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $7,454 $1,400 Implemented