Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
458
matching recommendationsSIC | 3569 | General Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0942 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $113,048 | $690,000 | Not Implemented |
GT0942 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,179 | $71,763 | Not Implemented |
GT0942 # 05 Y:2020 | 05 | 2020 | MINIMIZE WATER USAGE | $3,202 | $5,700 | Not Implemented |
GT0942 # 03 Y:2020 | 03 | 2020 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $14,945 | $4,781 | Not Implemented |
GT0942 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,618 | $2,500 | Implemented |
SD0574 # 05 Y:2019 | 05 | 2019 | REDUCE SCRAP PRODUCTION | $25,514 | $1,500 | Implemented |
SD0574 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $332 | $0 | Not Implemented |
SD0574 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $485 | $1,290 | Not Implemented |
SD0574 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $886 | $300 | Implemented |
SD0574 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,259 | $0 | Implemented |
UU0138 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,221 | $18,137 | Implemented |
UU0138 # 02 Y:2018 | 02 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,044 | $2,760 | Implemented |
UU0138 # 03 Y:2018 | 03 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,911 | $0 | Implemented |
UU0138 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,089 | $1,500 | Implemented |
UU0138 # 05 Y:2018 | 05 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $615 | $0 | Implemented |
UU0138 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $599 | $150 | Implemented |
SD0551 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $169 | $200 | Implemented |
SD0551 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $433 | $1,500 | Implemented |
SD0551 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $899 | $3,000 | Implemented |
SD0551 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,959 | $35,776 | Implemented |
SD0551 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,950 | $86,400 | Not Implemented |
UA0065 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,459 | $24,444 | Not Implemented |
UA0065 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $668 | $1,241 | Implemented |
UA0065 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,025 | $800 | Not Implemented |
UA0065 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $702 | $1,100 | Implemented |