IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

442

matching recommendations
Reset
SIC 357 Computer And Office Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0274 # 11 Y:2009 11 2009 OPTIMIZE PLANT POWER FACTOR $1,192 $7,749 Implemented
MZ0023 # 05 Y:2008 05 2008 REPAIR OR REPLACE STEAM TRAPS $47,858 $40,000 Implemented
MZ0023 # 04 Y:2008 04 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,210 $1,941 Not Implemented
MZ0023 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,564 $27,000 Implemented
MZ0023 # 02 Y:2008 02 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,828 $2,077 Not Implemented
MZ0023 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $183 $80 Implemented
IA0417 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,598 $46,276 Not Implemented
IA0417 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,956 $13,071 Not Implemented
IA0417 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,650 $1,078 Not Implemented
IA0417 # 04 Y:2007 04 2007 ADD AREA LIGHTING SWITCHES $7,664 $1,875 Not Implemented
IA0417 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,033 $3,978 Not Implemented
IA0417 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,044 $2,000 Not Implemented
MA0612 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $96,635 $175,500 Not Implemented
MA0612 # 02 Y:2007 02 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $57,921 $108,000 Not Implemented
MA0612 # 03 Y:2007 03 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $23,433 $12,750 Not Implemented
MA0612 # 04 Y:2007 04 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $21,000 $73,760 Not Implemented
MA0612 # 05 Y:2007 05 2007 REDUCE VENTILATION AIR $17,480 $8,040 Not Implemented
MA0612 # 06 Y:2007 06 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $16,924 $3,200 Not Implemented
MA0612 # 07 Y:2007 07 2007 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,963 $26,370 Not Implemented
MA0612 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,240 $11,700 Not Implemented
MA0612 # 09 Y:2007 09 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,610 $18,700 Not Implemented
MA0612 # 10 Y:2007 10 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,532 $8,000 Not Implemented
MA0612 # 11 Y:2007 11 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,799 $1,800 Not Implemented
LM0122 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $42,830 $89,250 Not Implemented
LM0122 # 02 Y:2007 02 2007 ISOLATE HOT OR COLD EQUIPMENT $814 $2,000 Not Implemented