Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsSIC | 3572 | Computer Storage Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0417 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $1,650 | $1,078 | Not Implemented |
IA0417 # 04 Y:2007 | 04 | 2007 | ADD AREA LIGHTING SWITCHES | $7,664 | $1,875 | Not Implemented |
IA0417 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,033 | $3,978 | Not Implemented |
IA0417 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,044 | $2,000 | Not Implemented |
MA0612 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $96,635 | $175,500 | Not Implemented |
MA0612 # 10 Y:2007 | 10 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,532 | $8,000 | Not Implemented |
MA0612 # 05 Y:2007 | 05 | 2007 | REDUCE VENTILATION AIR | $17,480 | $8,040 | Not Implemented |
MA0612 # 04 Y:2007 | 04 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $21,000 | $73,760 | Not Implemented |
MA0612 # 03 Y:2007 | 03 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $23,433 | $12,750 | Not Implemented |
MA0612 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $57,921 | $108,000 | Not Implemented |
MA0612 # 06 Y:2007 | 06 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,924 | $3,200 | Not Implemented |
MA0612 # 07 Y:2007 | 07 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,963 | $26,370 | Not Implemented |
MA0612 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $11,700 | Not Implemented |
MA0612 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,610 | $18,700 | Not Implemented |
MA0612 # 11 Y:2007 | 11 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,799 | $1,800 | Not Implemented |
NV0136 # 04 Y:1999 | 04 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $274 | $0 | Implemented |
NV0136 # 05 Y:1999 | 05 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $900 | $0 | Not Implemented |
NV0136 # 01 Y:1999 | 01 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,174 | $1,500 | Not Implemented |
NV0136 # 03 Y:1999 | 03 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,471 | $15,285 | Not Implemented |
NV0136 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,742 | $900 | Implemented |
OK0544 # 08 Y:1998 | 08 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $160 | $0 | Implemented |
OK0544 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $6,348 | $0 | Not Implemented |
OK0544 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $196 | $329 | Implemented |
OK0544 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $548 | Not Implemented |
OK0544 # 03 Y:1998 | 03 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $846 | $300 | Not Implemented |