Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 3577 | Computer Peripheral Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0500 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,000 | $31,500 | Implemented |
AS0420 # 06 Y:2006 | 06 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $885 | $13,820 | Implemented |
AS0420 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,338 | $5,000 | Implemented |
AS0420 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $18,572 | Implemented |
UF0258 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $14,400 | $0 | Implemented |
UF0258 # 06 Y:2000 | 06 | 2000 | METER WASTE WATER | $306 | $0 | Implemented |
UF0258 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,054 | $0 | Implemented |
UF0258 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,278 | $0 | Implemented |
UF0258 # 02 Y:2000 | 02 | 2000 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $833 | $0 | Implemented |
UF0258 # 05 Y:2000 | 05 | 2000 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $18,176 | $0 | Implemented |
CO0439 # 01 Y:1999 | 01 | 1999 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $187,200 | $13,080 | Implemented |
CO0439 # 04 Y:1999 | 04 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,620 | $8,400 | Implemented |
CO0439 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,900 | $2,000 | Implemented |
AS0221 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,312 | $60 | Implemented |
AS0221 # 09 Y:1998 | 09 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $4,757 | $805 | Implemented |
AS0221 # 08 Y:1998 | 08 | 1998 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $2,880 | $6,150 | Implemented |
AS0221 # 07 Y:1998 | 07 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,400 | $30 | Implemented |
AS0221 # 05 Y:1998 | 05 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $1,755 | $1,650 | Implemented |
AS0221 # 04 Y:1998 | 04 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,122 | $6,600 | Implemented |
SD0169 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $469 | Implemented |
SD0169 # 08 Y:1997 | 08 | 1997 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $11,496 | $3,480 | Implemented |
SD0169 # 05 Y:1997 | 05 | 1997 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,809 | $4,110 | Implemented |
SD0169 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,714 | $11,700 | Implemented |
SD0169 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,459 | $0 | Implemented |
SD0169 # 01 Y:1997 | 01 | 1997 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $20,154 | $3,300 | Implemented |