Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0449 # 07 Y:2024 | 07 | 2024 | METER WASTE WATER | $1,195 | $900 | n/a |
MI0449 # 02 Y:2024 | 02 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $15,070 | $13,480 | n/a |
MI0449 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,413 | $3,096 | n/a |
MI0449 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,976 | $61,998 | n/a |
MI0449 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,254 | $320 | n/a |
MI0449 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $1,980 | n/a |
MI0449 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,646 | $700 | n/a |
MI0442 # 02 Y:2024 | 02 | 2024 | METER WASTE WATER | $13,483 | $956 | n/a |
MI0442 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,720 | $159,280 | n/a |
MI0442 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,918 | $917 | n/a |
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | n/a |
MI0442 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,876 | $16,028 | n/a |
MI0442 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,134 | $240 | n/a |
MI0375 # 07 Y:2020 | 07 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $911 | $1,214 | Not Implemented |
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $339 | $984 | Implemented |
MI0375 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $617 | $1,522 | Implemented |
MI0375 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $939 | $280 | Implemented |
MI0375 # 03 Y:2020 | 03 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,971 | $965 | Not Implemented |
MI0375 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,948 | $2,692 | Not Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |
MI0374 # 03 Y:2020 | 03 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,237 | $480 | Not Implemented |
MI0374 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $23,161 | $320 | Not Implemented |
MI0374 # 02 Y:2020 | 02 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,650 | $4,760 | Not Implemented |