IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0239 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $80,476 $15,000 Not Implemented
UM0239 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,180 $1,100 Implemented
UM0239 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,330 $148,050 Implemented
UM0239 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247,018 $270,000 Implemented
UM0239 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $18,295 $24,675 Not Implemented
UM0239 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $300 Implemented
UM0239 # 06 Y:2003 06 2003 COVER OPEN TANKS $7,400 $3,290 Not Implemented
OK0661 # 06 Y:2003 06 2003 USE COMPRESSOR AIR FILTERS $3,339 $168 Not Implemented
OK0661 # 09 Y:2003 09 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,440 $2,500 Implemented
OK0661 # 08 Y:2003 08 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,061 $45,000 Implemented
OK0661 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $441 $262 Not Implemented
OK0661 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $1,271 $3,206 Not Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,245 $7,483 Not Implemented
OK0661 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $20,400 $0 Implemented
OK0661 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $72,173 $0 Not Implemented
UM0232 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,693 $1,000 Implemented
UM0232 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,492 $5,655 Not Implemented
UM0232 # 06 Y:2003 06 2003 INSTALL COMMON HEADER ON COMPRESSORS $13,700 $6,480 Implemented
UM0232 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,706 $1,660 Not Implemented
UM0232 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,683 $2,100 Implemented
UM0232 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,416 $10,600 Not Implemented
TA0048 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $690 $170 Implemented
TA0048 # 12 Y:2003 12 2003 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $200 $129 Implemented
TA0048 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $530 $47 Not Implemented