IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0314 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $133 $175 Not Implemented
UM0314 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $596 $660 Not Implemented
UM0314 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,953 $3,286 Not Implemented
UM0314 # 06 Y:2006 06 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,473 $400 Implemented
UM0314 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,136 $3,084 Not Implemented
UM0314 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,296 $7,000 Not Implemented
UM0314 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,963 $2,480 Implemented
UM0314 # 02 Y:2006 02 2006 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $30,865 $25,000 Not Implemented
UM0314 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $62,424 $69,750 Not Implemented
UM0239 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $300 Implemented
UM0239 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247,018 $270,000 Implemented
UM0239 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,330 $148,050 Implemented
UM0239 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $80,476 $15,000 Not Implemented
UM0239 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,180 $1,100 Implemented
UM0239 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $18,295 $24,675 Not Implemented
UM0239 # 06 Y:2003 06 2003 COVER OPEN TANKS $7,400 $3,290 Not Implemented
UM0232 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,683 $2,100 Implemented
UM0232 # 06 Y:2003 06 2003 INSTALL COMMON HEADER ON COMPRESSORS $13,700 $6,480 Implemented
UM0232 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,693 $1,000 Implemented
UM0232 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,706 $1,660 Not Implemented
UM0232 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,416 $10,600 Not Implemented
UM0232 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,492 $5,655 Not Implemented
ND0305 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $19,450 $11,886 Not Implemented
ND0305 # 01 Y:1998 01 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,973 $22,500 Not Implemented
ND0305 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,120 $85,000 Implemented