Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
TN0694 # 10 Y:2000 | 10 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,185 | $3,570 | Not Implemented |
TN0694 # 09 Y:2000 | 09 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,795 | $1,875 | Not Implemented |
TN0694 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $7,000 | Not Implemented |
TN0694 # 07 Y:2000 | 07 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $4,345 | $9,100 | Not Implemented |
TN0694 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,210 | $18,900 | Not Implemented |
TN0694 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $8,665 | $26,260 | Not Implemented |
TN0694 # 04 Y:2000 | 04 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,130 | $181,580 | Not Implemented |
TN0694 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $219,860 | $100,000 | Not Implemented |
TN0694 # 02 Y:2000 | 02 | 2000 | ADD AREA LIGHTING SWITCHES | $17,510 | $25,030 | Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
IA0242 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $276 | $45 | Not Implemented |
IA0242 # 09 Y:2000 | 09 | 2000 | APPLY FOR INVESTMENT INCENTIVES | $3,531 | $250 | Not Implemented |
IA0242 # 08 Y:2000 | 08 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $4,883 | $123 | Not Implemented |
IA0242 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $448 | $890 | Not Implemented |
IA0242 # 06 Y:2000 | 06 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,636 | $675 | Not Implemented |
IA0242 # 05 Y:2000 | 05 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $79 | $25 | Not Implemented |
IA0242 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $604 | $2,000 | Not Implemented |
IA0242 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $833 | $1,167 | Not Implemented |
IA0242 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,701 | $169 | Not Implemented |
MS0156 # 04 Y:2000 | 04 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $74,209 | $6,000 | Implemented |
MS0156 # 03 Y:2000 | 03 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,566 | $0 | Not Implemented |
MS0156 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,681 | $200 | Implemented |
MS0156 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $31,264 | $583 | Not Implemented |
AS0271 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $708 | $607 | Implemented |