IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0144 # 09 Y:1998 09 1998 MODIFY CURRENT INCENTIVE PROGRAM $27,108 $1,200 Not Implemented
SF0144 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $105,533 $72,440 Not Implemented
SF0144 # 11 Y:1998 11 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $86,019 $300,440 Not Implemented
AR0133 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,372 $186 Not Implemented
AR0133 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $4,289 $2,535 Not Implemented
AR0133 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $350 Not Implemented
AR0133 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $357 $2,695 Not Implemented
AR0133 # 05 Y:1998 05 1998 RECOVER AND REUSE COOLING WATER $13,814 $6,800 Not Implemented
AR0133 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,029 $0 Implemented
AR0133 # 07 Y:1998 07 1998 MOVE PRODUCT USING MECHANICAL MEANS $112,042 $118,598 Implemented
WI0286 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $29,011 $1,000 Not Implemented
WI0286 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $6,908 $1,000 Not Implemented
WI0286 # 03 Y:1997 03 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $2,999 $1,000 Not Implemented
WI0286 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,138 $5,000 Not Implemented
WI0286 # 05 Y:1997 05 1997 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $0 Not Implemented
WI0286 # 06 Y:1997 06 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,520 $88,000 Not Implemented
WI0286 # 07 Y:1997 07 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,085 $15,000 Not Implemented
WI0286 # 08 Y:1997 08 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,230 $10,230 Not Implemented
WI0286 # 09 Y:1997 09 1997 INSTALL TIMERS AND/OR THERMOSTATS $18,978 $3,600 Not Implemented
WI0286 # 10 Y:1997 10 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $210 Not Implemented
WI0286 # 11 Y:1997 11 1997 MINIMIZE WATER USAGE $274 $0 Not Implemented
WI0286 # 12 Y:1997 12 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $953 $0 Not Implemented
WI0286 # 13 Y:1997 13 1997 INSTALL OCCUPANCY SENSORS $575 $450 Not Implemented
WI0286 # 14 Y:1997 14 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $527 $328 Not Implemented
BD0060 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $9,949 $3,500 Implemented