Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
982
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0621 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,092 | $2,000 | Implemented |
UD0621 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,280 | $2,460 | Implemented |
UU0001 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,462 | $300 | Implemented |
UU0001 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $947 | $0 | Implemented |
MA0486 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,500 | $800 | Implemented |
MA0486 # 04 Y:2001 | 04 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,300 | $0 | Implemented |
MA0486 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,700 | $5,000 | Implemented |
MA0486 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $350 | Implemented |
MA0486 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $800 | $1,100 | Implemented |
BD0187 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $671 | $1,000 | Implemented |
BD0187 # 10 Y:2001 | 10 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,850 | $5,000 | Implemented |
IC0005 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,125 | $2,600 | Implemented |
IC0005 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $390 | $491 | Implemented |
IC0005 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $22,773 | $4,940 | Implemented |
IC0005 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $2,995 | Implemented |
WV0211 # 08 Y:2001 | 08 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,545 | $400 | Implemented |
WV0211 # 01 Y:2001 | 01 | 2001 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $4,516 | $690 | Implemented |
WV0211 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $40 | Implemented |
WV0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $518 | $675 | Implemented |
WV0211 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $628 | $560 | Implemented |
WV0211 # 09 Y:2001 | 09 | 2001 | INSTALL OCCUPANCY SENSORS | $1,150 | $500 | Implemented |
WV0211 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $848 | $120 | Implemented |
WV0211 # 11 Y:2001 | 11 | 2001 | USE OPTIMUM THICKNESS INSULATION | $538 | $510 | Implemented |
WV0211 # 14 Y:2001 | 14 | 2001 | INSULATE BARE EQUIPMENT | $261 | $128 | Implemented |
WV0211 # 15 Y:2001 | 15 | 2001 | INSULATE BARE EQUIPMENT | $135 | $69 | Implemented |