Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0742 # 04 Y:2021 04 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,318 $16,143 Implemented
CO0742 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $1,478 $359 Implemented
CO0742 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,833 $2,733 Implemented
CO0699 # 04 Y:2015 04 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,890 $500 Implemented
CO0699 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,690 $290 Implemented
CO0664 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $8,120 Implemented
CO0664 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,660 $410 Implemented
CO0444 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $230 $0 Implemented
CO0444 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $0 Implemented
CO0444 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,280 $1,000 Implemented
CO0341 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $250 Implemented
CO0341 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $260 Implemented
CO0341 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $260 Implemented
CO0341 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $16,550 Implemented
CO0311 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $570 Implemented
CO0311 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $400 Implemented
CO0260 # 13 Y:1992 13 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,130 $2,870 Implemented
CO0260 # 12 Y:1992 12 1992 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,750 $20,280 Implemented
CO0260 # 11 Y:1992 11 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $106 $900 Implemented
CO0260 # 09 Y:1992 09 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,880 $7,700 Implemented
CO0260 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $1,500 $700 Implemented
CO0260 # 06 Y:1992 06 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $176,510 $40,000 Implemented
CO0260 # 05 Y:1992 05 1992 COVER OPEN TANKS $13,870 $4,000 Implemented
CO0260 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,920 $8,750 Implemented
CO0260 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,820 $310 Implemented