Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0041 # 02 Y:2024 | 02 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $8,109 | $0 | n/a |
CC0041 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $4,448 | $6,882 | n/a |
CC0041 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,256 | $0 | n/a |
CC0041 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $180 | $308 | n/a |
CC0041 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,484 | $0 | n/a |
CC0041 # 07 Y:2024 | 07 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $563 | $0 | n/a |
CC0041 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,392 | $0 | n/a |
CC0041 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $6,020 | n/a |
GT0810 # 02 Y:2005 | 02 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $20,000 | $0 | Not Implemented |
GT0810 # 01 Y:2005 | 01 | 2005 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $30,000 | $0 | Not Implemented |
GT0810 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,359 | $9,400 | Not Implemented |
GT0810 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,228 | $6,378 | Implemented |
GT0810 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,562 | $7,239 | Not Implemented |
GT0810 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $25,152 | $62,500 | Not Implemented |
GT0810 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $7,399 | $7,301 | Not Implemented |
GT0810 # 07 Y:2005 | 07 | 2005 | INSTALL SPECTRAL REFLECTORS / DELAMP | $7,167 | $14,160 | Not Implemented |
GT0768 # 01 Y:2003 | 01 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,075 | $15,000 | n/a |
GT0768 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,376 | $0 | n/a |
GT0768 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $42,648 | $0 | n/a |
GT0768 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $13,900 | $2,400 | n/a |
GT0768 # 05 Y:2003 | 05 | 2003 | COMBINE UTILITY METERS | $16,340 | $0 | n/a |
GT0768 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,160 | $0 | n/a |
GT0768 # 07 Y:2003 | 07 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $14,590 | $4,725 | n/a |
GT0717 # 05 Y:2001 | 05 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,600 | $0 | Not Implemented |
GT0717 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,475 | $4,275 | Not Implemented |