IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0231 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,138 $57,000 Not Implemented
BD0231 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,777 $1,600 Implemented
BD0231 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $2,010 $2,025 Not Implemented
BD0231 # 11 Y:2003 11 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $348 $1,000 Not Implemented
BD0231 # 10 Y:2003 10 2003 AUTOMATE PAYROLL SYSTEM $6,240 $2,500 Implemented
BD0231 # 09 Y:2003 09 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $28,875 $20,000 Implemented
BD0231 # 07 Y:2003 07 2003 CONVERT TO ELECTROSTATIC POWDER COATING $12,010 $17,500 Implemented
BD0231 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $0 Implemented
BD0231 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $130 Implemented
BD0231 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $4,995 Not Implemented
BD0231 # 08 Y:2003 08 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $28,875 $15,000 Implemented
BD0205 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $300 Implemented
BD0205 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $133,965 $75,270 Not Implemented
BD0205 # 02 Y:2002 02 2002 USE RADIANT HEATER FOR SPOT HEATING $25,105 $60,000 Not Implemented
BD0205 # 03 Y:2002 03 2002 INSTALL AUTOMATIC STACK DAMPER $4,550 $5,000 Not Implemented
BD0205 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,089 $4,800 Implemented
BD0205 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,003 $1,000 Implemented
BD0205 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,324 $1,425 Not Implemented
BD0205 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $552 $800 Not Implemented
BD0205 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $360 Implemented
BD0205 # 06 Y:2002 06 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,411 $1,500 Not Implemented
BD0187 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $400 $1,125 Not Implemented
BD0187 # 09 Y:2001 09 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $118 $300 Not Implemented
BD0187 # 10 Y:2001 10 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,850 $5,000 Implemented
IC0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,125 $2,600 Implemented