IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0187 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $0 Not Implemented
BD0187 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $671 $1,000 Implemented
BD0187 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $210 Not Implemented
BD0187 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $400 $1,125 Not Implemented
BD0187 # 09 Y:2001 09 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $118 $300 Not Implemented
BD0187 # 10 Y:2001 10 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,850 $5,000 Implemented
IC0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,125 $2,600 Implemented
IC0005 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $390 $491 Implemented
IC0005 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,971 $88,900 n/a
IC0005 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $22,773 $4,940 Implemented
IC0005 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $2,995 Implemented
IC0005 # 06 Y:2001 06 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $102,000 $15,000 Not Implemented
IC0005 # 07 Y:2001 07 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $340,000 $8,500 Not Implemented
BD0177 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,288 $500 Implemented
BD0177 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $3,171 $1,425 Not Implemented
BD0177 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $2,294 $500 Not Implemented
BD0177 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,988 $0 Not Implemented
BD0177 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,694 $3,090 Not Implemented
BD0177 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $726 $500 Not Implemented
BD0177 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,899 $40,000 Not Implemented
BD0177 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $27,022 $30,000 Not Implemented
BD0177 # 09 Y:2001 09 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,497 $10,000 Not Implemented
BD0169 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,339 $13,140 Not Implemented
BD0169 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,421 $700 Implemented
BD0169 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,564 $2,000 Not Implemented