Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0311 # 01 Y:1990 | 01 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,239 | $2,150 | Implemented |
OK0311 # 02 Y:1990 | 02 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $2,549 | $750 | Implemented |
OK0311 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,942 | $1,641 | Not Implemented |
OK0311 # 04 Y:1990 | 04 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $578 | $190 | Implemented |
OK0311 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,396 | $0 | Implemented |
OK0311 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,283 | $632 | Not Implemented |
OK0311 # 07 Y:1990 | 07 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,494 | $975 | Implemented |
AM0094 # 09 Y:1990 | 09 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $260 | $0 | Implemented |
AM0094 # 01 Y:1990 | 01 | 1990 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $31,894 | $22,000 | Implemented |
AM0094 # 08 Y:1990 | 08 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $580 | $270 | Implemented |
AM0094 # 07 Y:1990 | 07 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $500 | Implemented |
AM0094 # 06 Y:1990 | 06 | 1990 | IMPROVE LUBRICATION PRACTICES | $670 | $0 | Implemented |
AM0094 # 05 Y:1990 | 05 | 1990 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,260 | $675 | Implemented |
AM0094 # 04 Y:1990 | 04 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,870 | $3,160 | Implemented |
AM0094 # 03 Y:1990 | 03 | 1990 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $6,807 | $7,920 | Implemented |
AM0094 # 02 Y:1990 | 02 | 1990 | INSTALL SET-BACK TIMERS | $8,700 | $450 | Implemented |
OK0306 # 05 Y:1990 | 05 | 1990 | OPTIMIZE PLANT POWER FACTOR | $10,716 | $16,250 | Not Implemented |
OK0306 # 08 Y:1990 | 08 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $493 | $150 | Implemented |
OK0306 # 07 Y:1990 | 07 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,419 | $0 | Not Implemented |
OK0306 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $810 | $1,300 | Implemented |
OK0306 # 04 Y:1990 | 04 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,384 | $0 | Not Implemented |
OK0306 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $110 | $102 | Implemented |
OK0306 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $859 | $640 | Not Implemented |
OK0306 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,969 | $27,903 | Not Implemented |
WI0076 # 09 Y:1990 | 09 | 1990 | INSTALL STORM WINDOWS AND DOORS | $482 | $1,440 | Not Implemented |