IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 3592 Carburetors, Pistons, Rings, Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0009 # 01 Y:2022 01 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,128 $0 Not Implemented
MU0009 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $348 $795 Implemented
MU0009 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $352 $0 Implemented
MU0009 # 04 Y:2022 04 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $821 $90 Implemented
MU0009 # 03 Y:2022 03 2022 ISOLATE HOT OR COLD EQUIPMENT $1,187 $0 Implemented
MU0009 # 02 Y:2022 02 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $3,019 $855 Implemented
NC0459 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,710 $4,085 Not Implemented
NC0459 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $624 Not Implemented
NC0459 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $8,552 Implemented
NC0459 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,453 $152,640 Implemented
NC0459 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,477 $67,898 Implemented
NC0459 # 09 Y:2012 09 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $313 $750 Implemented
NC0459 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,985 $600 Implemented
NC0459 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $222 $300 Implemented
NC0459 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $1,980 Not Implemented
TT0039 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1 $0 Implemented
TT0039 # 04 Y:2009 04 2009 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,266 $12,000 Implemented
TT0039 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,163 $16,183 Implemented
TT0039 # 06 Y:2009 06 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,012 $250 Not Implemented
TT0039 # 05 Y:2009 05 2009 IMPROVE COMBUSTION CONTROL CAPABILITY $112,568 $64,000 Not Implemented
TT0039 # 03 Y:2009 03 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $77,380 $7,000 Implemented
TT0039 # 07 Y:2009 07 2009 OPTIMIZE PLANT POWER FACTOR $11,430 $13,000 Not Implemented
UM0291 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,293 $9,000 Implemented
UM0291 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,138 $19,073 Not Implemented
UM0291 # 03 Y:2005 03 2005 COVER OPEN TANKS $4,518 $2,366 Implemented