IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 3592 Carburetors, Pistons, Rings, Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented
UF0328 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $0 Implemented
UF0328 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,817 $12,292 Implemented
UF0328 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,031 $0 Implemented
UF0328 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,395 $0 Implemented
UF0328 # 07 Y:2003 07 2003 IMPROVE SPACE COMFORT CONDITIONING $3,900 $4,000 Implemented
NV0053 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $3,287 $878 Implemented
NV0053 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $300 Implemented
NV0053 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,776 $302 Implemented
NV0053 # 09 Y:1996 09 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,417 $1,504 Implemented
SD0105 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $3,100 Implemented
SD0105 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,343 $5,870 Implemented
SD0105 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,310 $200 Implemented
SD0105 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $2,426 Implemented
SD0105 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $1,957 $2,820 Implemented
SD0105 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $381 $591 Implemented
SD0105 # 07 Y:1995 07 1995 USE PHOTOCELL CONTROLS $447 $28 Implemented
CO0260 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $500 Implemented
CO0260 # 05 Y:1992 05 1992 COVER OPEN TANKS $13,870 $4,000 Implemented
CO0260 # 06 Y:1992 06 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $176,510 $40,000 Implemented
CO0260 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $1,500 $700 Implemented
CO0260 # 09 Y:1992 09 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,880 $7,700 Implemented
CO0260 # 11 Y:1992 11 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $106 $900 Implemented
CO0260 # 12 Y:1992 12 1992 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,750 $20,280 Implemented
CO0260 # 13 Y:1992 13 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,130 $2,870 Implemented