IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0717 # 09 Y:2001 09 2001 INSTALL BACK-UP EQUIPMENT $7,200 $29,314 Implemented
SU0103 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,880 $1,125 Implemented
SU0103 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,743 $0 Implemented
SU0103 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $826 $543 Implemented
OK0622 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,626 $2,120 Implemented
OK0622 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,659 $1,089 Implemented
OK0622 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,700 $654 Implemented
OK0622 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,100 $152,055 Implemented
OK0622 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $635,180 $125,000 Implemented
UD0621 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,768 $0 Implemented
UD0621 # 03 Y:2001 03 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,723 $0 Implemented
UD0621 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,092 $2,000 Implemented
UD0621 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,280 $2,460 Implemented
UU0001 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $300 Implemented
UU0001 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $947 $0 Implemented
MA0486 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,500 $800 Implemented
MA0486 # 04 Y:2001 04 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,300 $0 Implemented
MA0486 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,700 $5,000 Implemented
MA0486 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $350 Implemented
MA0486 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $1,100 Implemented
BD0187 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $671 $1,000 Implemented
BD0187 # 10 Y:2001 10 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,850 $5,000 Implemented
IC0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,125 $2,600 Implemented
IC0005 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $390 $491 Implemented
IC0005 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $22,773 $4,940 Implemented