Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
725
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0717 # 09 Y:2001 | 09 | 2001 | INSTALL BACK-UP EQUIPMENT | $7,200 | $29,314 | Implemented |
SU0103 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,880 | $1,125 | Implemented |
SU0103 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,743 | $0 | Implemented |
SU0103 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $826 | $543 | Implemented |
OK0622 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,626 | $2,120 | Implemented |
OK0622 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,659 | $1,089 | Implemented |
OK0622 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,700 | $654 | Implemented |
OK0622 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $70,100 | $152,055 | Implemented |
OK0622 # 07 Y:2001 | 07 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $635,180 | $125,000 | Implemented |
UD0621 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,768 | $0 | Implemented |
UD0621 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,723 | $0 | Implemented |
UD0621 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,092 | $2,000 | Implemented |
UD0621 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,280 | $2,460 | Implemented |
UU0001 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,462 | $300 | Implemented |
UU0001 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $947 | $0 | Implemented |
MA0486 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,500 | $800 | Implemented |
MA0486 # 04 Y:2001 | 04 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,300 | $0 | Implemented |
MA0486 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,700 | $5,000 | Implemented |
MA0486 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $350 | Implemented |
MA0486 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $800 | $1,100 | Implemented |
BD0187 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $671 | $1,000 | Implemented |
BD0187 # 10 Y:2001 | 10 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,850 | $5,000 | Implemented |
IC0005 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,125 | $2,600 | Implemented |
IC0005 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $390 | $491 | Implemented |
IC0005 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $22,773 | $4,940 | Implemented |