IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0350 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,546 $13,122 Implemented
WI0350 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $474 $500 Implemented
WI0350 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $456 $740 Implemented
IA0211 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $2,579 $1,064 Implemented
IA0211 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,935 $700 Implemented
IA0211 # 04 Y:1998 04 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,305 $2,250 Implemented
IA0211 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $57,028 $800 Implemented
IA0211 # 07 Y:1998 07 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $24,960 $25,440 Implemented
NV0108 # 02 Y:1998 02 1998 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $11,472 $15,808 Implemented
NV0108 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $259 $0 Implemented
NV0108 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,992 $350 Implemented
NV0108 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $794 $220 Implemented
UD0536 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,739 $17,011 Implemented
UD0536 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,000 $0 Implemented
UM0103 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,962 $200 Implemented
ND0289 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,054 $2,780 Implemented
ND0289 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $831 $200 Implemented
ND0289 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $545 $53 Implemented
ND0289 # 12 Y:1997 12 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $103 $57 Implemented
SF0121 # 01 Y:1997 01 1997 USE PHOTOCELL CONTROLS $1,069 $1,500 Implemented
SF0121 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $0 Implemented
SF0121 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $60 Implemented
SF0121 # 04 Y:1997 04 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,633 $0 Implemented
SF0121 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $143 $720 Implemented
SF0121 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $1,656 $2,000 Implemented