Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,657
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0161 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,330 | $7,355 | Implemented |
DS0161 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $1,323 | $1,050 | Implemented |
DS0161 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,603 | $180 | Not Implemented |
DS0161 # 04 Y:2000 | 04 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $1,142 | $2,040 | Implemented |
DS0161 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $758 | $1,130 | Implemented |
DS0161 # 06 Y:2000 | 06 | 2000 | BURN WASTE OIL FOR HEAT | $1,329 | $3,495 | Not Implemented |
DS0161 # 07 Y:2000 | 07 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $1,560 | $3,000 | Not Implemented |
DS0161 # 08 Y:2000 | 08 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,203 | $0 | Implemented |
AS0270 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,324 | $6,008 | Implemented |
AS0270 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $896 | $300 | Not Implemented |
AS0270 # 03 Y:2000 | 03 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,275 | $1,890 | Not Implemented |
AS0270 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,608 | $200 | Implemented |
AS0270 # 05 Y:2000 | 05 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $516 | $60 | Not Implemented |
AS0270 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $190 | $95 | Not Implemented |
AS0270 # 07 Y:2000 | 07 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $269,180 | $100,000 | Implemented |
BD0149 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,642 | $22,260 | n/a |
BD0149 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,378 | $2,060 | n/a |
BD0149 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $1,154 | $1,125 | n/a |
BD0149 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,016 | $1,250 | n/a |
BD0149 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $561 | $0 | n/a |
BD0149 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $294 | $350 | n/a |
BD0149 # 07 Y:1999 | 07 | 1999 | CLEAR AND RENT EXISTING SPACE | $56,400 | $2,500 | n/a |
BD0149 # 08 Y:1999 | 08 | 1999 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $9,100 | $0 | n/a |
BD0149 # 09 Y:1999 | 09 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,008 | $10,000 | n/a |
ME0277 # 01 Y:1999 | 01 | 1999 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,431 | $1,766 | Implemented |