IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,657

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0575 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $480,000 $175,000 Not Implemented
UD0575 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $144,000 $150,000 Not Implemented
UD0575 # 03 Y:1999 03 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $39,515 $10,000 Implemented
UD0575 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $14,341 $15,000 Implemented
WI0350 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,546 $13,122 Implemented
WI0350 # 02 Y:1999 02 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,263 $500 Not Implemented
WI0350 # 03 Y:1999 03 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,981 $0 Not Implemented
WI0350 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $1,508 $1,000 Not Implemented
WI0350 # 05 Y:1999 05 1999 USE OPTIMUM THICKNESS INSULATION $1,212 $1,538 Not Implemented
WI0350 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $474 $500 Implemented
WI0350 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $456 $740 Implemented
UM0140 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,168 $780 Not Implemented
UM0140 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,110 $600 Not Implemented
UM0140 # 03 Y:1999 03 1999 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $27,426 $13,000 Not Implemented
UM0140 # 04 Y:1999 04 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,688 $3,600 Not Implemented
UM0140 # 05 Y:1999 05 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $225,811 $90,000 Not Implemented
UM0140 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,613 $0 Not Implemented
UM0140 # 07 Y:1999 07 1999 MODIFY STARTUP/SHUTDOWN TIMES $36,686 $0 Not Implemented
IA0211 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,647 $53,193 Not Implemented
IA0211 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $2,579 $1,064 Implemented
IA0211 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,935 $700 Implemented
IA0211 # 04 Y:1998 04 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,305 $2,250 Implemented
IA0211 # 05 Y:1998 05 1998 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $8,750 $1,448 Not Implemented
IA0211 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $57,028 $800 Implemented
IA0211 # 07 Y:1998 07 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $24,960 $25,440 Implemented