Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0311 # 07 Y:1990 | 07 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,494 | $975 | Implemented |
OK0311 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,283 | $632 | Not Implemented |
OK0311 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,396 | $0 | Implemented |
OK0311 # 04 Y:1990 | 04 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $578 | $190 | Implemented |
OK0311 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,942 | $1,641 | Not Implemented |
OK0311 # 02 Y:1990 | 02 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $2,549 | $750 | Implemented |
OK0311 # 01 Y:1990 | 01 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,239 | $2,150 | Implemented |
AM0094 # 02 Y:1990 | 02 | 1990 | INSTALL SET-BACK TIMERS | $8,700 | $450 | Implemented |
AM0094 # 09 Y:1990 | 09 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $260 | $0 | Implemented |
AM0094 # 01 Y:1990 | 01 | 1990 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $31,894 | $22,000 | Implemented |
AM0094 # 03 Y:1990 | 03 | 1990 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $6,807 | $7,920 | Implemented |
AM0094 # 04 Y:1990 | 04 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,870 | $3,160 | Implemented |
AM0094 # 05 Y:1990 | 05 | 1990 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,260 | $675 | Implemented |
AM0094 # 06 Y:1990 | 06 | 1990 | IMPROVE LUBRICATION PRACTICES | $670 | $0 | Implemented |
AM0094 # 07 Y:1990 | 07 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $500 | Implemented |
AM0094 # 08 Y:1990 | 08 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $580 | $270 | Implemented |
OK0306 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,969 | $27,903 | Not Implemented |
OK0306 # 07 Y:1990 | 07 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,419 | $0 | Not Implemented |
OK0306 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $810 | $1,300 | Implemented |
OK0306 # 05 Y:1990 | 05 | 1990 | OPTIMIZE PLANT POWER FACTOR | $10,716 | $16,250 | Not Implemented |
OK0306 # 04 Y:1990 | 04 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,384 | $0 | Not Implemented |
OK0306 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $110 | $102 | Implemented |
OK0306 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $859 | $640 | Not Implemented |
OK0306 # 08 Y:1990 | 08 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $493 | $150 | Implemented |
UD0304 # 06 Y:1990 | 06 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,648 | $7,000 | Not Implemented |