IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0090 # 01 Y:2012 01 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,862 $26,757 Not Implemented
UA0090 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $12,249 Not Implemented
UA0090 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,138 $2,200 Implemented
UA0090 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $4,203 Not Implemented
UA0090 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,518 $13,900 Not Implemented
UA0090 # 03 Y:2012 03 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,678 $142 Implemented
UA0090 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,021 $2,488 Not Implemented
SU0325 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $46,347 $5,200 Not Implemented
SU0325 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,105 $2,640 Implemented
SU0325 # 03 Y:2012 03 2012 ELIMINATE/REDUCE AN OPERATION $24,636 $20,468 Implemented
SU0325 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $1,286 $5,127 Not Implemented
SU0325 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,516 $10,889 Not Implemented
UM0412 # 06 Y:2012 06 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,939 $4,000 Not Implemented
UM0412 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $874 $1,000 Implemented
UM0412 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,308 $2,850 Implemented
UM0412 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $775 $100 Not Implemented
UM0412 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $600 Not Implemented
UM0412 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,923 $1,300 Implemented
CO0664 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,660 $410 Implemented
CO0664 # 01 Y:2012 01 2012 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,690 $10,600 Not Implemented
CO0664 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $8,120 Implemented
CO0664 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $1,710 $2,560 Not Implemented
WV0456 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,458 $2,000 Not Implemented
WV0456 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,893 $58,995 Implemented
WV0456 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,618 $33,940 Not Implemented