IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,774

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0251 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,500 $15,000 Implemented
UD0251 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,275 $0 Implemented
UD0251 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $300 Implemented
TN0329 # 02 Y:1988 02 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,471 $2,193 Implemented
TN0329 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,753 $615 Implemented
TN0329 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,619 $0 Implemented
TN0329 # 05 Y:1988 05 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,783 $3,300 Implemented
TN0329 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,824 $1,180 Implemented
TN0329 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $1,824 $0 Implemented
TN0329 # 09 Y:1988 09 1988 INSULATE BARE EQUIPMENT $1,106 $146 Implemented
TN0329 # 10 Y:1988 10 1988 COVER OPEN TANKS $252 $0 Implemented
TN0329 # 12 Y:1988 12 1988 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $179 $600 Implemented
CO0107 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $161 $200 Implemented
CO0107 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $226 $2,000 Implemented
CO0107 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,136 $700 Implemented
CO0107 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,111 $1,150 Implemented
CO0107 # 06 Y:1987 06 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,215 $250 Implemented
CO0107 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $921 $318 Implemented
WI0013 # 02 Y:1987 02 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $302 $0 Implemented
WI0013 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,253 $4,328 Implemented
WI0013 # 04 Y:1987 04 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $840 $1,500 Implemented
WI0013 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $882 $700 Implemented
TN0323 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,914 $0 Implemented
TN0323 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,487 $520 Implemented
TN0323 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $1,200 Implemented