IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,791

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0225 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,131 $14,688 Implemented
UD0221 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $16,515 $0 Implemented
UD0221 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,218 $0 Implemented
UD0221 # 04 Y:1987 04 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,322 $10,000 Implemented
UD0221 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $7,926 $9,000 Implemented
UD0221 # 06 Y:1987 06 1987 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,822 $2,070 Implemented
AT0059 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $612 Implemented
AT0059 # 02 Y:1986 02 1986 REDUCE SCRAP PRODUCTION $3,755 $2,000 Implemented
AT0059 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,952 $10,000 Implemented
AT0059 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $2,006 $0 Implemented
ST0076 # 01 Y:1986 01 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $47,801 $60,000 Implemented
ST0076 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,121 $500 Implemented
ST0076 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,072 $3,540 Implemented
ST0076 # 05 Y:1986 05 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,494 $70 Implemented
ST0076 # 06 Y:1986 06 1986 OPTIMIZE PLANT POWER FACTOR $9,576 $0 Implemented
ST0076 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,024 $2,090 Implemented
ST0066 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,389 $1,400 Implemented
ST0066 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $0 Implemented
ST0066 # 03 Y:1986 03 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $148 $100 Implemented
ST0066 # 06 Y:1986 06 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,041 $0 Implemented
ST0066 # 07 Y:1986 07 1986 INSTALL TIMERS AND/OR THERMOSTATS $5,537 $1,000 Implemented
ST0066 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $0 Implemented
AT0044 # 01 Y:1986 01 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,139 $3,000 Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented