IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,726

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0035 # 14 Y:1985 14 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,586 $3,500 Implemented
KU0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,947 $125 Implemented
CO0033 # 01 Y:1985 01 1985 REDUCE VENTILATION AIR $27,000 $399 Implemented
CO0033 # 02 Y:1985 02 1985 REDUCE VENTILATION AIR $7,279 $824 Implemented
CO0033 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,343 $4,000 Implemented
CO0033 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $655 $3,000 Implemented
CO0033 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $200 Implemented
CO0033 # 07 Y:1985 07 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $134 $162 Implemented
CO0033 # 08 Y:1985 08 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,006 $3,619 Implemented
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented
CO0035 # 05 Y:1985 05 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,596 $24 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
OK0175 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,252 Implemented
OK0175 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $748 $400 Implemented
OK0175 # 05 Y:1985 05 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,954 $4,000 Implemented
OK0171 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $965 $700 Implemented
OK0171 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $20,880 $1,500 Implemented
OK0171 # 03 Y:1985 03 1985 OPTIMIZE PLANT POWER FACTOR $690 $1,315 Implemented
OK0171 # 04 Y:1985 04 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $4,668 $50 Implemented
OK0171 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $55 $130 Implemented
OK0171 # 06 Y:1985 06 1985 MINIMIZE WATER USAGE $2,464 $0 Implemented