IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,791

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0018 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,065 $13 Implemented
SU0124 # 05 Y:2001 05 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,144 $9,900 Implemented
UD0624 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,975 $13,704 Implemented
UD0624 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $414 Implemented
UD0620 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $3,648 Implemented
UD0620 # 06 Y:2001 06 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,218 $0 Implemented
UD0620 # 08 Y:2001 08 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $756 $0 Implemented
UF0272 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,855 $5,330 Implemented
UF0272 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $9,635 $50 Implemented
MI0004 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $312 Implemented
MI0004 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $697 $221 Implemented
MI0004 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $861 $14 Implemented
GT0711 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $1,450 Implemented
GT0711 # 05 Y:2001 05 2001 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $15 $0 Implemented
LE0106 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $4,410 Implemented
LE0106 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,638 $0 Implemented
LE0106 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $961 $1,250 Implemented
OR0388 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $187,500 $18,000 Implemented
OR0388 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $290,325 $250,000 Implemented
OR0388 # 03 Y:2001 03 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,900 $60,000 Implemented
OR0388 # 04 Y:2001 04 2001 MODIFY CURRENT INCENTIVE PROGRAM $368,300 $29,120 Implemented
SF0214 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $606 $0 Implemented
SF0214 # 05 Y:2001 05 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,324 $2,880 Implemented
TA0001 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $275 Implemented
TA0001 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $447 $0 Implemented