Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0400 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $75 | $200 | Implemented |
NC0400 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $1,761 | $4,346 | Implemented |
NC0400 # 02 Y:2010 | 02 | 2010 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $9,007 | $37,000 | Implemented |
NC0378 # 11 Y:2008 | 11 | 2008 | USE PHOTOCELL CONTROLS | $3,452 | $12,000 | Implemented |
NC0378 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $97,991 | $50,000 | Implemented |
NC0378 # 06 Y:2008 | 06 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,591 | $7,700 | Implemented |
NC0378 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,481 | $100 | Implemented |
NC0378 # 08 Y:2008 | 08 | 2008 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $226,587 | $37,500 | Implemented |
NC0378 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $10,000 | $1,000 | Implemented |
WV0289 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,600 | $4,857 | Implemented |
WV0289 # 15 Y:2004 | 15 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,365 | $0 | Implemented |
WV0289 # 12 Y:2004 | 12 | 2004 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,170 | $103 | Implemented |
WV0289 # 14 Y:2004 | 14 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,227 | $1,631 | Implemented |
WV0289 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,993 | $250 | Implemented |
WV0289 # 04 Y:2004 | 04 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $9,956 | $2,109 | Implemented |
WV0289 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,340 | $127 | Implemented |
WV0289 # 05 Y:2004 | 05 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,230 | $1,687 | Implemented |
TN0687 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,289 | $2,150 | Implemented |
TN0687 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,680 | $350 | Implemented |
TN0687 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $720 | $0 | Implemented |
TN0687 # 01 Y:2000 | 01 | 2000 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $25,255 | $1,075 | Implemented |
TN0687 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,703 | $750 | Implemented |
TN0687 # 04 Y:2000 | 04 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,210 | $820 | Implemented |
OD0100 # 02 Y:1997 | 02 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $503 | $0 | Implemented |
OD0054 # 05 Y:1996 | 05 | 1996 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,786 | $1,296 | Implemented |