IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0033 # 08 Y:1985 08 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,006 $3,619 Implemented
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
OK0175 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $748 $400 Implemented
OK0175 # 05 Y:1985 05 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,954 $4,000 Implemented
OK0175 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,252 Implemented
ST0022 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $256 $85 Implemented
KU0160 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,662 $2,000 Implemented
KU0160 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,982 $900 Implemented
KU0160 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,445 $10,000 Implemented
ST0022 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,376 $160 Implemented
ST0022 # 03 Y:1985 03 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,760 $420 Implemented
ST0022 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $148 $0 Implemented
ST0022 # 06 Y:1985 06 1985 REDUCE GLAZED AREAS IN BUILDINGS $186 $91 Implemented
ST0022 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,480 $1,246 Implemented
ST0022 # 11 Y:1985 11 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $767 $5 Implemented
OK0171 # 06 Y:1985 06 1985 MINIMIZE WATER USAGE $2,464 $0 Implemented
OK0171 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $55 $130 Implemented
OK0171 # 04 Y:1985 04 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $4,668 $50 Implemented
OK0171 # 03 Y:1985 03 1985 OPTIMIZE PLANT POWER FACTOR $690 $1,315 Implemented
OK0171 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $20,880 $1,500 Implemented
OK0171 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $965 $700 Implemented