IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,559

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0619 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,151 $7,151 Not Implemented
MA0619 # 09 Y:2007 09 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,560 $1,184 Implemented
LE0254 # 01 Y:2007 01 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $81,900 $65,000 Not Implemented
LE0254 # 02 Y:2007 02 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $67,570 $67,000 Not Implemented
LE0254 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,157 $20,000 Not Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,471 $800 Not Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
LE0254 # 07 Y:2007 07 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,029 $800 Not Implemented
MS0314 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,129 $10,729 Implemented
MS0314 # 02 Y:2007 02 2007 PURCHASE EQUIPMENT INSTEAD OF LEASING $3,612 $10,968 Not Implemented
MS0314 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,816 $9,213 Implemented
MS0314 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,048 $166 Implemented
MS0314 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $915 $1,175 Implemented
MS0314 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $844 $712 Not Implemented
MA0613 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $22,488 $15,475 Implemented
MA0613 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,346 $54,617 Implemented
MA0613 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,574 $53,250 Implemented
MA0613 # 04 Y:2007 04 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,408 $15,900 Not Implemented
MA0613 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $507 $256 Implemented
SU0250 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,666 $0 Not Implemented
SU0250 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $0 Implemented
SU0250 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Implemented
SU0250 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $82 $0 Implemented
SU0250 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,654 $425 Implemented