IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0528 # 02 Y:2003 02 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,180 $16,000 Not Implemented
MA0528 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $2,103 $1,325 Implemented
MA0528 # 04 Y:2003 04 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,752 $0 Implemented
MA0528 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,167 $9,862 Not Implemented
MA0528 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,973 $48,190 Not Implemented
ME0261 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,284 $80,602 Implemented
ME0261 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,394 $3,080 Implemented
ME0261 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,535 $25,000 Implemented
ME0261 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,477 $7,909 Implemented
ME0261 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,134 $900 Implemented
ME0261 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,914 $11,200 Not Implemented
ME0261 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,704 $12,000 Implemented
ME0261 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $1,053 $1,200 Implemented
ME0261 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $886 $200 Implemented
ME0261 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $788 $500 Implemented
ME0261 # 11 Y:1999 11 1999 DEVELOP A REPAIR/REPLACE POLICY $271 $325 Implemented
ME0261 # 12 Y:1999 12 1999 $29 $27 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 04 Y:1998 04 1998 IMPROVE SPACE COMFORT CONDITIONING $5,656 $11,874 Not Implemented
MA0428 # 05 Y:1998 05 1998 ADOPT IN-HOUSE MATERIAL GENERATION $5,618 $29,750 Not Implemented
MA0372 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,954 $51,942 Not Implemented
MA0372 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,515 $822 Not Implemented
MA0372 # 01 Y:1996 01 1996 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $25,870 $11,700 Not Implemented