Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0289 # 13 Y:2004 | 13 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,628 | $1,119 | Not Implemented |
WV0289 # 14 Y:2004 | 14 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,227 | $1,631 | Implemented |
WV0289 # 15 Y:2004 | 15 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,365 | $0 | Implemented |
TN0687 # 01 Y:2000 | 01 | 2000 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $25,255 | $1,075 | Implemented |
TN0687 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,703 | $750 | Implemented |
TN0687 # 03 Y:2000 | 03 | 2000 | TREAT AND REUSE RINSE WATERS | $6,496 | $14,340 | Not Implemented |
TN0687 # 04 Y:2000 | 04 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,210 | $820 | Implemented |
TN0687 # 05 Y:2000 | 05 | 2000 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,280 | $2,925 | Not Implemented |
TN0687 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,289 | $2,150 | Implemented |
TN0687 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,680 | $350 | Implemented |
TN0687 # 08 Y:2000 | 08 | 2000 | INSULATE BARE EQUIPMENT | $1,562 | $188 | Not Implemented |
TN0687 # 09 Y:2000 | 09 | 2000 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $893 | $2,950 | Not Implemented |
TN0687 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $720 | $0 | Implemented |
OD0139 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,834 | $61,640 | Not Implemented |
OD0139 # 02 Y:1999 | 02 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $447 | $4,020 | Not Implemented |
OD0139 # 03 Y:1999 | 03 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $82 | $20 | Not Implemented |
OD0139 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,555 | $2,000 | Not Implemented |
NC0153 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $541 | $800 | Not Implemented |
NC0153 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,691 | $18,850 | Not Implemented |
NC0153 # 03 Y:1998 | 03 | 1998 | ADD AREA LIGHTING SWITCHES | $91 | $300 | Not Implemented |
NC0153 # 04 Y:1998 | 04 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,508 | $500 | Not Implemented |
NC0153 # 05 Y:1998 | 05 | 1998 | INSTALL SKYLIGHTS | $10,344 | $36,000 | Not Implemented |
NC0153 # 06 Y:1998 | 06 | 1998 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $3,423 | $3,000 | Not Implemented |
NC0153 # 07 Y:1998 | 07 | 1998 | CLEAR AND RENT EXISTING SPACE | $28,000 | $20,500 | Not Implemented |
OD0100 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $824 | $3,754 | Not Implemented |