IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0410 # 04 Y:2010 04 2010 IMPROVE LUBRICATION PRACTICES $1,907 $618 Implemented
WV0410 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $1,430 $5,800 Not Implemented
WV0410 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,273 $210 Implemented
WV0410 # 07 Y:2010 07 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,222 $3,100 Not Implemented
WV0410 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,020 $67 Implemented
WV0410 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $563 $274 Not Implemented
WV0410 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $20 Implemented
WV0410 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $440 Not Implemented
MA0666 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,146 $5,990 Not Implemented
MA0666 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,085 $8,685 Not Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0666 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $550 $200 Not Implemented
LL0326 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,220 $15,480 Implemented
LL0326 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,166 $6,970 Implemented
LL0326 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $13,685 $3,250 Implemented
LL0326 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,178 $1,470 Not Implemented
LL0326 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,693 $2,340 Not Implemented
TT0050 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,500 $2,900 Not Implemented
TT0050 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,479 $4,300 Implemented
TT0050 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $6,800 $1,000 Not Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented
TT0050 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $500 $400 Not Implemented
OK0788 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $451 Implemented
OK0788 # 02 Y:2010 02 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $29,667 $2,587 Not Implemented