Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,708
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0280 # 04 Y:1986 | 04 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,539 | $2,750 | Implemented |
TN0280 # 05 Y:1986 | 05 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $747 | $0 | Not Implemented |
TN0280 # 06 Y:1986 | 06 | 1986 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $335 | $445 | Not Implemented |
TN0280 # 07 Y:1986 | 07 | 1986 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $259 | $275 | Implemented |
TN0275 # 01 Y:1986 | 01 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $5,736 | $3,400 | Not Implemented |
TN0275 # 02 Y:1986 | 02 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,746 | $10,000 | Not Implemented |
TN0275 # 03 Y:1986 | 03 | 1986 | REDESIGN PROCESS | $6,722 | $17,900 | Not Implemented |
TN0275 # 04 Y:1986 | 04 | 1986 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,462 | $12,675 | Not Implemented |
TN0275 # 05 Y:1986 | 05 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,628 | $375 | Implemented |
TN0275 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,571 | $1,300 | Implemented |
TN0272 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,076 | $3,600 | Not Implemented |
TN0272 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,110 | $750 | Implemented |
TN0272 # 03 Y:1986 | 03 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,861 | $440 | Implemented |
TN0272 # 04 Y:1986 | 04 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $576 | $448 | Implemented |
ST0051 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $62 | $0 | Not Implemented |
ST0051 # 02 Y:1986 | 02 | 1986 | TURN OFF EQUIPMENT WHEN NOT IN USE | $339 | $0 | Implemented |
ST0051 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $92 | $40 | Implemented |
ST0051 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,602 | $0 | Not Implemented |
ST0051 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,847 | $800 | Not Implemented |
ST0051 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,207 | $4,638 | Implemented |
ST0051 # 07 Y:1986 | 07 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,440 | $0 | Implemented |
ST0051 # 08 Y:1986 | 08 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,534 | $10,000 | Not Implemented |
ST0051 # 09 Y:1986 | 09 | 1986 | INSTALL STORM WINDOWS AND DOORS | $2,273 | $1,000 | Not Implemented |
ST0051 # 10 Y:1986 | 10 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,088 | $1,200 | Not Implemented |
KU0190 # 01 Y:1986 | 01 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,383 | $50 | Implemented |