Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,551
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0018 # 06 Y:1985 | 06 | 1985 | USE OPTIMUM THICKNESS INSULATION | $550 | $210 | Implemented |
CO0018 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $8,891 | $2,400 | Implemented |
CO0018 # 08 Y:1985 | 08 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $246 | $50 | Implemented |
CO0018 # 09 Y:1985 | 09 | 1985 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $863 | $500 | Not Implemented |
UD0150 # 01 Y:1985 | 01 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,440 | $0 | Implemented |
UD0150 # 02 Y:1985 | 02 | 1985 | INSTALL STORM WINDOWS AND DOORS | $7,089 | $4,000 | Not Implemented |
UD0150 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,196 | $2,972 | Not Implemented |
UD0150 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $646 | $140 | Implemented |
UD0150 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $702 | $3,000 | Implemented |
UD0150 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,218 | $1,360 | Implemented |
TS0010 # 01 Y:1985 | 01 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,024 | $1,500 | Implemented |
TS0010 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $876 | $94 | Implemented |
TS0010 # 03 Y:1985 | 03 | 1985 | REDUCE VENTILATION AIR | $4,602 | $460 | Implemented |
TS0010 # 04 Y:1985 | 04 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $158 | $25 | Implemented |
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0148 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,754 | $3,000 | Implemented |
KU0148 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $514 | $800 | Implemented |
KU0148 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $436 | $700 | Implemented |
KU0148 # 05 Y:1984 | 05 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $366 | $100 | Implemented |
KU0148 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $173 | $70 | Not Implemented |
KU0148 # 07 Y:1984 | 07 | 1984 | INSULATE BARE EQUIPMENT | $1,738 | $1,240 | Not Implemented |
KU0148 # 08 Y:1984 | 08 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $99 | $150 | Not Implemented |
KU0148 # 09 Y:1984 | 09 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $298 | $12 | Implemented |
KU0148 # 10 Y:1984 | 10 | 1984 | REDUCE VENTILATION AIR | $2,954 | $500 | Implemented |
KU0148 # 11 Y:1984 | 11 | 1984 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,658 | $15,000 | Not Implemented |