IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0214 # 10 Y:1999 10 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,000 $800 Not Implemented
MA0423 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,806 $300 Implemented
MA0423 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,841 $2,700 Implemented
MA0423 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $234 Implemented
MA0423 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,279 $80,000 Not Implemented
MA0423 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $585 $2,627 Implemented
MA0423 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $187 $294 Not Implemented
MA0423 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $149 $257 Not Implemented
MA0394 # 01 Y:1997 01 1997 CLEAR AND RENT EXISTING SPACE $262,500 $0 Implemented
MA0394 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,097 $320,340 Implemented
MA0394 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,317 $24,908 Not Implemented
MA0394 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $4,225 Not Implemented
MA0394 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,330 $271 Implemented
MA0394 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,120 $0 Not Implemented
MA0393 # 01 Y:1997 01 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $92,750 $68,000 Implemented
MA0393 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $8,750 $1,000 Implemented
MA0393 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $2,550 $356 Implemented
MA0393 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,895 $10 Implemented
MA0393 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $160 $0 Implemented
MA0393 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $147 $0 Implemented
MA0274 # 01 Y:1993 01 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $9,079 $2,733 Not Implemented
MA0274 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,949 $125 Not Implemented
MA0274 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $853 $0 Not Implemented
MA0274 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $91 Not Implemented
MA0274 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $687 $169 Not Implemented