Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
285
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0323 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $87,704 | $291,200 | Implemented |
NC0252 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $240 | $100 | Not Implemented |
NC0252 # 02 Y:2003 | 02 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,800 | $6,000 | Implemented |
NC0252 # 01 Y:2003 | 01 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,411 | $20,000 | Not Implemented |
NC0252 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,917 | $400 | Implemented |
NC0252 # 05 Y:2003 | 05 | 2003 | REDESIGN PROCESS | $4,814 | $780 | Implemented |
NC0252 # 06 Y:2003 | 06 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $780 | $1,000 | Implemented |
NC0252 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $130 | $350 | Not Implemented |
NC0226 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $150 | Not Implemented |
NC0226 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,122 | $2,225 | Not Implemented |
NC0226 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,800 | $400 | Not Implemented |
NC0226 # 08 Y:2001 | 08 | 2001 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $93,403 | $-312,000 | Not Implemented |
NC0226 # 07 Y:2001 | 07 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,668 | $26,000 | Not Implemented |
NC0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,071 | $407 | Not Implemented |
NC0226 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,348 | $500 | Not Implemented |
NC0226 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $10,828 | $12,834 | Not Implemented |
NC0196 # 07 Y:2000 | 07 | 2000 | METER WASTE WATER | $4,843 | $15,000 | Not Implemented |
NC0196 # 06 Y:2000 | 06 | 2000 | REVISE SMOKE CLEANUP FROM OPERATIONS | $6,218 | $8,400 | Not Implemented |
NC0196 # 02 Y:2000 | 02 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,495 | $100 | Implemented |
NC0196 # 05 Y:2000 | 05 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,438 | $10,000 | Implemented |
NC0196 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,142 | $5,000 | Not Implemented |
NC0196 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $411 | $1,080 | Not Implemented |
NC0196 # 04 Y:2000 | 04 | 2000 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $292 | $1,100 | Not Implemented |
NC0198 # 06 Y:2000 | 06 | 2000 | USE SOLAR HEAT TO HEAT WATER | $27,142 | $97,350 | Not Implemented |
NC0198 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,845 | $820 | Implemented |