Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,559
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0104 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,300 | $9,570 | Not Implemented |
DL0104 # 09 Y:2013 | 09 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $30,500 | $700 | Not Implemented |
DL0104 # 10 Y:2013 | 10 | 2013 | MINIMIZE WATER USAGE | $5,100 | $280 | Not Implemented |
DL0104 # 11 Y:2013 | 11 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $48,100 | $50,000 | Not Implemented |
DL0104 # 12 Y:2013 | 12 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,500 | $31,050 | Not Implemented |
DL0104 # 13 Y:2013 | 13 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,200 | $3,800 | Not Implemented |
DL0104 # 14 Y:2013 | 14 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $29,700 | $1,320 | Not Implemented |
DL0104 # 15 Y:2013 | 15 | 2013 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $18,800 | $45,000 | Not Implemented |
DL0104 # 16 Y:2013 | 16 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,505 | $10,700 | Not Implemented |
DL0104 # 17 Y:2013 | 17 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,800 | $37,400 | Not Implemented |
DL0104 # 18 Y:2013 | 18 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,900 | $45,000 | Not Implemented |
DL0104 # 19 Y:2013 | 19 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $19,700 | $100 | Not Implemented |
IP0014 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $25,849 | $0 | Not Implemented |
IP0014 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,997 | $0 | Implemented |
IP0014 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,183 | $0 | Implemented |
IP0014 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,360 | $0 | Implemented |
IP0014 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $263 | $0 | Implemented |
IP0014 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $1,409 | $58 | Not Implemented |
IP0014 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,703 | $2,128 | Not Implemented |
IP0014 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $653 | $1,081 | Not Implemented |
OR0603 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $11,386 | $5,275 | Not Implemented |
OR0603 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,204 | $0 | Implemented |
OR0603 # 03 Y:2013 | 03 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,936 | $0 | Implemented |
OR0603 # 04 Y:2013 | 04 | 2013 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,411 | $293,900 | Not Implemented |
OR0603 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $73,635 | $1,475,828 | Not Implemented |