IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0254 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,240 $0 Implemented
WV0254 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $3,154 Implemented
WV0254 # 13 Y:2002 13 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,844 $4,000 Not Implemented
WV0254 # 15 Y:2002 15 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
UD0638 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $75,000 $10,000 Implemented
UD0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,000 $17,017 Implemented
UD0638 # 03 Y:2002 03 2002 MAKE A NEW BY-PRODUCT $49,743 $30,000 Implemented
UD0638 # 04 Y:2002 04 2002 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $18,300 $4,175 Not Implemented
UD0638 # 05 Y:2002 05 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,572 $21,682 Not Implemented
UD0638 # 06 Y:2002 06 2002 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,079 $18,900 Not Implemented
UD0638 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,787 $0 Not Implemented
UD0638 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,144 $6,458 Implemented
UD0638 # 09 Y:2002 09 2002 OPTIMIZE PLANT POWER FACTOR $1,935 $1,800 Not Implemented
UD0638 # 10 Y:2002 10 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,751 $0 Implemented
UD0638 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,211 $250 Implemented
UD0638 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128 $101 Implemented
UD0624 # 01 Y:2001 01 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $29,813 $10,710 Not Implemented
UD0624 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,975 $13,704 Implemented
UD0624 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $414 Implemented
UD0624 # 04 Y:2001 04 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $281 $500 Not Implemented
UD0620 # 01 Y:2001 01 2001 RECOVER AND REUSE SPENT ACID BATHS $42,596 $85,000 Not Implemented
UD0620 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,449 $300 Not Implemented
UD0620 # 03 Y:2001 03 2001 RECOVER AND REUSE SPENT ACID BATHS $2,250 $0 Not Implemented
UD0620 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,850 $0 Not Implemented
UD0620 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $3,648 Implemented