IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0345 # 12 Y:2006 12 2006 DEVELOP A REPAIR/REPLACE POLICY $5,468 $800 Implemented
WV0345 # 13 Y:2006 13 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,389 $6,500 Not Implemented
LE0232 # 01 Y:2006 01 2006 MODIFY WORKLOAD $35,100 $3,200 Not Implemented
LE0232 # 02 Y:2006 02 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $33,102 $38,465 Not Implemented
LE0232 # 03 Y:2006 03 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $7,750 $3,510 Not Implemented
LE0232 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,787 $500 Not Implemented
LE0232 # 05 Y:2006 05 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,612 $620 Not Implemented
LE0232 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $60 Not Implemented
LE0232 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $363 $500 Not Implemented
LE0232 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $7,549 $2,440 Not Implemented
LE0232 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,445 $51,983 Not Implemented
WV0330 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,602 $0 Implemented
WV0330 # 02 Y:2005 02 2005 ADD AREA LIGHTING SWITCHES $3,316 $1,325 Implemented
WV0330 # 03 Y:2005 03 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $1,364 $3,679 Not Implemented
WV0330 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,049 $35 Implemented
WV0330 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $789 $6 Implemented
WV0330 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $508 $105 Implemented
WV0330 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $474 $140 Not Implemented
WV0330 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $95 Implemented
LE0106 # 01 Y:2001 01 2001 USE LESS WASTEFUL PACKAGING $1,700 $0 Not Implemented
LE0106 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $640 Not Implemented
LE0106 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $4,410 Implemented
LE0106 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,638 $0 Implemented
LE0106 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $961 $1,250 Implemented
LE0106 # 06 Y:2001 06 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $6,293 $41,225 Not Implemented