IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0462 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $808 $2,500 Not Implemented
WI0462 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $840 Not Implemented
WI0462 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $438 Not Implemented
AS0370 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,289 $150 Not Implemented
AS0370 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,258 $39,378 Not Implemented
AS0370 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,336 $12,650 Not Implemented
AS0370 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,545 $16,000 Not Implemented
AS0370 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $1,844 Not Implemented
AS0370 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,372 $5,500 Not Implemented
MA0546 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $16,130 $4,480 Not Implemented
MA0546 # 02 Y:2004 02 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,348 $4,712 n/a
MA0546 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $11,157 $1,992 Not Implemented
MA0546 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $7,495 $1,200 Implemented
MA0546 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,827 $4,972 Implemented
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,839 $282 Not Implemented
MA0546 # 08 Y:2004 08 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $981 $720 Not Implemented
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
AM0451 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $13,040 $12,960 Not Implemented
AM0451 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,160 $500 Implemented
AM0451 # 03 Y:2004 03 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,300 $15,770 n/a
AM0451 # 04 Y:2004 04 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,830 $0 Implemented
AM0451 # 05 Y:2004 05 2004 REUSE RAGS UNTIL COMPLETELY SOILED $1,790 $1,910 Implemented
AM0451 # 06 Y:2004 06 2004 COVER OPEN TANKS $940 $500 Not Implemented
AM0451 # 07 Y:2004 07 2004 COVER OPEN TANKS $805 $500 Not Implemented