Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
375
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0028 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $27,609 | $10,000 | n/a |
NT0028 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $11,431 | $6,584 | n/a |
NT0028 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,571 | $9,184 | n/a |
NT0028 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,367 | $0 | n/a |
NT0028 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,518 | $5,609 | n/a |
NT0028 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,586 | $20,775 | n/a |
NT0028 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $21,431 | $520 | n/a |
WM0211 # 02 Y:2024 | 02 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $5,517 | $16,193 | n/a |
WM0211 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $0 | n/a |
WM0211 # 01 Y:2024 | 01 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $7,114 | $700 | n/a |
WM0211 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,148 | $150 | n/a |
WM0211 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $345 | n/a |
WM0211 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,617 | $9,500 | n/a |
SD0645 # 05 Y:2024 | 05 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $48,532 | $0 | Not Implemented |
SD0645 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,997 | $84,760 | Not Implemented |
SD0645 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,027 | $20,044 | Not Implemented |
SD0645 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $1,694 | Not Implemented |
SD0645 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,908 | $5,515 | Not Implemented |
SD0645 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,170 | $3,900 | Not Implemented |
SD0645 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,560 | $10,840 | Not Implemented |
SD0645 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $49,587 | $0 | Not Implemented |
MZ0337 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,882 | $6,873 | Implemented |
MZ0337 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $314 | $100 | Implemented |
MZ0337 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,106 | $2,400 | Implemented |
MZ0337 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $330 | $820 | Not Implemented |