IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

551

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0209 # 05 Y:1998 05 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $4,330 $78 Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
MO0231 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $990 $1,872 Implemented
MO0231 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented
MO0231 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,947 $5,800 Implemented
MS0107 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,339 $2,000 Implemented
MS0107 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,719 $3,248 Implemented
MS0107 # 04 Y:1998 04 1998 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $96,541 $13,936 Implemented
MS0107 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,757 $20,202 Implemented
MS0107 # 07 Y:1998 07 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,237 $0 Implemented
MS0107 # 09 Y:1998 09 1998 CONDENSE OPERATION INTO ONE BUILDING $187,809 $34,932 Implemented
WI0316 # 04 Y:1998 04 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $6,566 $0 Implemented
DS0103 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $3,332 $2,000 Implemented
DS0103 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $625 Implemented
DS0103 # 04 Y:1998 04 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,970 $100 Implemented
DS0103 # 06 Y:1998 06 1998 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $110 $0 Implemented
AR0125 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,085 $186 Implemented
AR0125 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,152 $150 Implemented
AR0125 # 07 Y:1997 07 1997 RECOVER AND REUSE COOLING WATER $6,309 $8,400 Implemented
AR0125 # 08 Y:1997 08 1997 RECOVER AND REUSE COOLING WATER $4,837 $31,000 Implemented
AR0125 # 09 Y:1997 09 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $31,334 $2,000 Implemented
WV0120 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $248 Implemented