IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0279 # 10 Y:1996 10 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,744 $15,000 Not Implemented
WI0279 # 11 Y:1996 11 1996 REDUCE VENTILATION AIR $351 $500 Implemented
NC0099 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,822 $7,500 n/a
NC0099 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,237 $27,552 n/a
NC0099 # 03 Y:1996 03 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $201 $40 n/a
NC0099 # 04 Y:1996 04 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $289 $10 n/a
NC0099 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,927 $200 n/a
NC0099 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,592 $390 n/a
NC0099 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $1,600 n/a
NC0099 # 08 Y:1996 08 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,584 $66,000 n/a
WI0257 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,977 $0 Not Implemented
WI0257 # 02 Y:1996 02 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $5,468 $15,000 Not Implemented
WI0257 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,982 $7,000 Not Implemented
WI0257 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,323 $3,075 Not Implemented
WI0257 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $1,246 $0 Not Implemented
HO0127 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $167 $40 Implemented
HO0127 # 02 Y:1996 02 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,231 $657 Implemented
HO0127 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $317 $400 Implemented
HO0127 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $400 Not Implemented
MS0047 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,642 $54,665 Not Implemented
MS0047 # 02 Y:1996 02 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,466 $1,785 Not Implemented
MS0047 # 03 Y:1996 03 1996 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $7,857 $9,300 Not Implemented
MS0047 # 04 Y:1996 04 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,169 $3,000 Not Implemented
MS0047 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $3,495 Not Implemented
MS0047 # 06 Y:1996 06 1996 USE RE-USABLE FILTERS $11,040 $12,000 Not Implemented