IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3625 Relays And Industrial Controls
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0483 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,476 $15 Not Implemented
BD0421 # 04 Y:2013 04 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,147 $1,500 Not Implemented
BD0421 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,067 $1,425 Implemented
BD0421 # 06 Y:2013 06 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,564 $40 Not Implemented
BD0421 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,968 $1,500 Implemented
BD0421 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,571 $15,000 Implemented
BD0421 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,995 $1,140 Not Implemented
BD0421 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,364 $30,195 Implemented
BD0421 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,219 $2,000 Not Implemented
BD0421 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $700 Implemented
BD0421 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $4,683 $4,200 Implemented
BD0410 # 06 Y:2012 06 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,832 $4,900 Not Implemented
BD0410 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $2,094 $2,025 Not Implemented
BD0410 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,907 $500 Not Implemented
BD0410 # 09 Y:2012 09 2012 INSTALL AUTOMATIC STACK DAMPER $1,223 $1,750 Not Implemented
BD0410 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $3,095 $1,000 Not Implemented
BD0410 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $4,755 $4,050 Not Implemented
BD0410 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $821 $10,000 Not Implemented
BD0410 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,850 $20 Not Implemented
BD0410 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,500 $5,500 Not Implemented
IC0175 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $991 $0 Not Implemented
IC0175 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,765 $1,956 Not Implemented
IC0175 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $9,779 $2,404 Not Implemented
IC0175 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $867 $627 Not Implemented
IC0175 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,695 $76 Not Implemented