IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

403

matching recommendations
Reset
SIC 363 Household Appliances
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0196 # 02 Y:1998 02 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $75,000 $66,000 Not Implemented
IA0196 # 03 Y:1998 03 1998 AUTOMATE FINISHING PROCESS $68,064 $11,000 Not Implemented
IA0196 # 04 Y:1998 04 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $83,349 $0 Implemented
IA0196 # 05 Y:1998 05 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $30,000 Not Implemented
IA0196 # 06 Y:1998 06 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $30,000 $900 Implemented
IA0196 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $3,048 Not Implemented
IA0196 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $2,080 Not Implemented
IA0196 # 09 Y:1998 09 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $15 Not Implemented
AS0218 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $681 $3,333 Not Implemented
AS0218 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $457 $1,200 Not Implemented
AS0218 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $284 Implemented
AS0218 # 04 Y:1998 04 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $417 $320 Implemented
AS0218 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $406 Implemented
AS0218 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,335 $4,124 Implemented
AS0218 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,347 $9,180 Not Implemented
AS0218 # 08 Y:1998 08 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,225 $3,150 Implemented
AS0218 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,775 $60 Implemented
AS0218 # 10 Y:1998 10 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $941 $60 Implemented
AS0218 # 11 Y:1998 11 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,609,654 $4,960 Not Implemented
TN0617 # 01 Y:1997 01 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $24,900 $21,000 n/a
TN0617 # 02 Y:1997 02 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $22,800 $16,000 n/a
TN0617 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $5,800 $4,500 n/a
TN0617 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,350 $4,050 n/a
TN0617 # 05 Y:1997 05 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,475 $810 n/a
OK0524 # 01 Y:1997 01 1997 ELIMINATE SHIFT $86,855 $175,000 Not Implemented