IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0637 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $122 $600 Implemented
WV0637 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $164 $483 Implemented
WV0637 # 06 Y:2023 06 2023 DEVELOP A REPAIR/REPLACE POLICY $502 $617 Implemented
WV0637 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $50 Implemented
WV0637 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,065 $3,353 Implemented
WV0637 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $188 Implemented
WV0425 # 07 Y:2011 07 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,578 $3,004 Implemented
WV0425 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,760 $0 Implemented
WV0425 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,251 $9,400 Implemented
LE0292 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $961 $420 Implemented
LE0292 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,073 $3,000 Implemented
LE0292 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,459 $200 Implemented
LE0292 # 04 Y:2009 04 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,921 $3,000 Implemented
LE0292 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,415 $180 Implemented
LE0292 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,667 $27,000 Implemented
WV0376 # 14 Y:2008 14 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $196 Implemented
WV0376 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $963 $1,431 Implemented
WV0376 # 11 Y:2008 11 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,649 $0 Implemented
WV0376 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,750 $1,363 Implemented
WV0376 # 08 Y:2008 08 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,621 $425 Implemented
WV0376 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,318 $0 Implemented
WV0376 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,611 $7,140 Implemented
WV0376 # 04 Y:2008 04 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,524 $8,800 Implemented
WV0376 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $7,524 $5,130 Implemented
WV0376 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,887 $23,022 Implemented