IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0824 # 01 Y:2020 01 2020 REPLACE BOILER $15,999 $29,000 Not Implemented
MA0824 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $10,379 $54,695 Not Implemented
MA0824 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,177 $29,750 Implemented
MA0824 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,118 $7,710 Implemented
MA0824 # 05 Y:2020 05 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,491 $6,300 Implemented
MA0668 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,899 $11,500 Implemented
MA0668 # 03 Y:2011 03 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,401 $11,610 Implemented
MA0668 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $3,004 $3,750 Implemented
MA0668 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,755 $200 Not Implemented
MA0668 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,802 $7,000 Not Implemented
MA0668 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $986 $950 Implemented
MA0668 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,378 $1,800 Implemented
MA0651 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $18,774 $1,000 Not Implemented
MA0651 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,725 $18,300 Not Implemented
MA0651 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,941 $3,219 Not Implemented
MA0651 # 04 Y:2009 04 2009 COVER OPEN TANKS $10,013 $5,866 Not Implemented
MA0651 # 03 Y:2009 03 2009 REPLACE BOILER $10,080 $30,700 Implemented
MA0651 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,340 $96,800 Implemented
MA0423 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,806 $300 Implemented
MA0423 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,841 $2,700 Implemented
MA0423 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $234 Implemented
MA0423 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,279 $80,000 Not Implemented
MA0423 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $585 $2,627 Implemented
MA0423 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $187 $294 Not Implemented
MA0423 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $149 $257 Not Implemented