IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
SIC 3669 Communications Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0259 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,066 $100 Not Implemented
IA0259 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $530 $1,073 Implemented
IA0259 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,277 $139 Implemented
IA0259 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $58 Not Implemented
IA0259 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $120 $40 Not Implemented
IA0259 # 06 Y:2000 06 2000 RECOVER AND REUSE SPENT ACID BATHS $58,747 $2,500 Not Implemented
DS0172 # 07 Y:2000 07 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $4,500 $17,260 Not Implemented
DS0172 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,262 $4,230 Implemented
DS0172 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $721 $1,770 Not Implemented
DS0172 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,033 $2,718 Implemented
DS0172 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $569 $864 Implemented
DS0172 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,907 $8,927 Implemented
DS0172 # 06 Y:2000 06 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $1,287 $450 Not Implemented
OR0313 # 03 Y:1998 03 1998 ELIMINATE/REDUCE AN OPERATION $627 $0 Not Implemented
OR0313 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $59,850 $437 Implemented
OR0313 # 02 Y:1998 02 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $53,400 $18,750 Not Implemented
OR0313 # 04 Y:1998 04 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,605 $0 Implemented
OR0313 # 05 Y:1998 05 1998 UPGRADE CONTROLS ON COMPRESSORS $7,486 $1,210 Not Implemented
OR0313 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,060 $2,670 Implemented
ME0153 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $300 Implemented
ME0153 # 07 Y:1995 07 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $22,220 $30,000 Not Implemented
ME0153 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $926 $50 Implemented
NC0050 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,208 $4,662 Implemented
NC0050 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,041 $9,817 Implemented
NC0050 # 03 Y:1995 03 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,910 $15,000 Not Implemented