IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0090 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $375 $500 Implemented
CO0090 # 07 Y:1987 07 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,133 $2,000 Implemented
CO0090 # 08 Y:1987 08 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,147 $1,350 Implemented
CO0090 # 09 Y:1987 09 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $65 $90 Implemented
CO0090 # 10 Y:1987 10 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $1,000 Implemented
KU0220 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,362 $3,200 Implemented
KU0220 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,475 $600 Not Implemented
KU0220 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $0 Implemented
KU0220 # 04 Y:1987 04 1987 COVER OPEN TANKS $756 $70 Not Implemented
KU0220 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $10 Implemented
AT0044 # 01 Y:1986 01 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,139 $3,000 Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented
AT0044 # 03 Y:1986 03 1986 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,314 $2,000 Not Implemented
AT0044 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,618 $250 Not Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented
ST0043 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,145 $292 Not Implemented
ST0043 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $100 Implemented
ST0043 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Implemented
ST0043 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented
ST0043 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $431 $234 Not Implemented
ST0043 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $649 $1,570 Not Implemented
ST0043 # 07 Y:1985 07 1985 IMPROVE LUBRICATION PRACTICES $1,193 $0 Not Implemented
ST0043 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $18,809 $4,989 Not Implemented
ST0043 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $33 Implemented
ST0043 # 10 Y:1985 10 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,293 $420 Implemented