IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0568 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $6,680 Implemented
CO0568 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $540 $0 Not Implemented
CO0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $1,140 Not Implemented
CO0568 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $330 Implemented
CO0511 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,040 $9,500 Not Implemented
CO0511 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $10,160 $14,010 Not Implemented
CO0511 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $4,380 $990 Not Implemented
CO0511 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $100 $0 Not Implemented
CO0511 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Not Implemented
CO0511 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $370 $300 Not Implemented
CO0511 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,290 $1,200 Not Implemented
CO0511 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $190 Implemented
CO0511 # 04 Y:2002 04 2002 USE HEAT PUMP FOR SPACE CONDITIONING $4,020 $0 Not Implemented
CO0503 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $946 Implemented
CO0503 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,053 $0 Not Implemented
CO0503 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $51,590 $6,250 Implemented
CO0503 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,310 $430 Implemented
CO0503 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $2,760 $3,360 Not Implemented
CO0503 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,730 $870 Not Implemented
CO0503 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $2,160 $2,040 Not Implemented
CO0503 # 02 Y:2002 02 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $25,940 $0 Implemented
CO0424 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,030 $450 Not Implemented
CO0424 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,580 $1,000 Not Implemented
CO0423 # 07 Y:1998 07 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,350 $6,900 Implemented
CO0423 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $140 $420 Implemented